Guide · export rates

Octopus export tariffs compared: what each pays a home battery

Octopus export tariff choices changed in 2026: Outgoing Octopus fell from 15p to 12p a unit in March, and a new Prime Outgoing tariff arrived in June paying more in the evening peak. Which one is worth having depends on when you export, so we looked at what Agile Outgoing actually paid in each of 14 regions over the last 12 months.

Prices and rules checked 28 October 2026

Quick answer

Octopus offers five domestic export tariffs. Outgoing Octopus pays a flat 12p per kWh. Prime Outgoing pays 16p from 4pm to 7pm and 9p at other times on a 12-month fixed term. Agile Outgoing follows wholesale prices half-hour by half-hour. Flux export pays 27.17p to 30.68p in the 4pm to 7pm peak but needs Flux import, solar and a battery. Outgoing SEG pays 4.1p and is for export-only customers. Prime beats the flat 12p only if at least 43% of your export falls between 4pm and 7pm, which a battery can arrange and solar alone cannot.

The five Octopus export tariffs

Octopus publishes the unit rates for its export products on its public API, and the same rates apply in all 14 regions. On 14 October 2026, with Octopus’s own descriptions alongside:

TariffWhat it paysTermSuits
Outgoing Octopus12.00p per kWh, flat, all dayVariable; Octopus will give notice of changesSolar homes exporting at midday; anyone who wants simplicity
Prime Outgoing Octopus16.00p from 4pm to 7pm; 9.00p at all other times12-month fixed; Octopus says no exit feeHomes with a battery that can export in the evening peak
Agile Outgoing OctopusHalf-hourly, from the day-ahead wholesale price; no fixed rateOctopus describes a 12-month term with no exit feeBatteries and people willing to follow prices
Octopus Flux, export side4.50p to 4.94p from 2am to 5am; 10.60p to 11.64p most of the day; 28.90p to 31.75p from 4pm to 7pm (28 October 2026)VariableHomes with solar and a battery on Flux import
Outgoing SEG (Smart Export Guarantee)4.10p flatOctopus’s SEG-compliant tariffExport-only customers who import from another supplier

Three things changed this year. Outgoing Octopus was cut from 15p to 12p on 1 March 2026, with Octopus saying wholesale costs had fallen in 2023 and been fairly stable since April 2024. Prime Outgoing launched in June 2026 (its API record is dated 23 June). Octopus’s API also shows 12-month fixed versions of Go, Cosy and Intelligent Go available from 14 October 2026.

What Agile Outgoing actually paid

Agile Outgoing is the one tariff whose rate we cannot read off a list, so we pulled every half-hourly price from the API for each region, 17,520 prices from 14 October 2025 to 13 October 2026. Octopus’s FAQ describes the rate as following the day-ahead wholesale price with a peak bonus between 4pm and 7pm, and says it is floored just above zero when wholesale prices go negative. Over the year:

RegionAverage, all half-hoursAverage, 4pm to 7pmEvenings above 12pEvenings above 16p
Eastern England11.3p19.3p361 of 365332
East Midlands10.8p18.1p358272
London11.4p18.4p359297
Merseyside and North Wales11.6p18.6p359306
West Midlands10.8p18.3p358292
North East England10.8p16.9p355197
North West England11.3p18.2p358282
Southern England11.1p19.0p361325
South East England11.3p19.5p361338
South Wales10.9p17.4p357233
South West England10.9p18.9p361325
Yorkshire10.9p17.7p358248
South Scotland10.9p16.1p347152
North Scotland11.1p15.3p332113

The pattern is the same everywhere: cheap through the day, dear in the evening. Over a whole day Agile Outgoing averaged between 10.8p and 11.6p, below the flat 12p. Between 11am and 3pm, when a solar array exports most, it averaged about 9.0p in London, and only 13% of those half-hours beat 12p. But from 4pm to 7pm it averaged between 15.3p (North Scotland) and 19.5p (South East England), above the flat 12p on 332 to 361 evenings out of 365 and above Prime’s 16p on between 113 and 338.

The highest half-hour of the year was 43.2p in the South East and Eastern England, and the lowest region maximum was 39.5p in North Scotland.

What a battery would have earned exporting

A battery that sells 9 kWh a day (about what 10 kWh delivers after losses) needs five half-hours at the 3.68 kW limit that a normal G98 connection allows. Putting that 9 kWh into the best five half-hours of each day, the last year’s export revenue would have been:

RegionAgile OutgoingPrime OutgoingOutgoing Octopus (12p)
Eastern England£650£526£394
East Midlands£611£526£394
London£621£526£394
Merseyside and North Wales£630£526£394
West Midlands£618£526£394
North East England£574£526£394
North West England£618£526£394
Southern England£641£526£394
South East England£657£526£394
South Wales£592£526£394
South West England£636£526£394
Yorkshire£602£526£394
South Scotland£553£526£394
North Scotland£531£526£394

These are revenue, not profit: they ignore what it cost to fill the battery, and they assume 9 kWh is available to export every day, which a solar-and-battery home using its own electricity often will not have. They show a ranking, not a promise. Agile Outgoing beat Prime by 1% in North Scotland and by 25% in the South East, but it is a variable tariff that moves with wholesale prices, and it needs a battery that can follow them. Prime and Outgoing are known quantities.

Prime against flat: the break-even

Prime pays 7p more than its off-peak rate for the evening window, and its off-peak rate is 3p below the flat 12p. If a fraction x of your export falls between 4pm and 7pm, Prime beats 12p when 16x + 9(1 minus x) is more than 12, which is when x is above 3 in 7, or 42.9%. That arithmetic is ours, not Octopus’s.

  • A battery that exports only in the evening peak (x = 100%) earns 16p against 12p, 33% more on Prime.
  • A solar array exporting mostly at midday (x close to 0) earns 9p against 12p, 25% less.
  • A solar-and-battery home sits in between, depending on how the battery is set up. If the battery covers the evening peak in the home rather than exporting, x is small and flat 12p wins.

Flux export: the highest rate, with strings

Flux paid between 28.90p and 31.75p from 4pm to 7pm across the 14 regions on 28 October 2026, and about 11p for most of the rest of the day. Octopus’s export tariffs page says Flux needs solar and a home battery, and it pairs with Flux import, whose rates and 19 October rate and standing charge rises are on the Octopus Flux rates page. The export rate is only half of the tariff: charging the battery at the Flux night rate costs about 15p to 17p a kWh, and a normal G98 connection still caps export at about 3.68 kW, or 11 kWh in the three-hour window.

Which tariff for which home

Your homeA sensible choiceWhy
Solar, no batteryOutgoing Octopus (12p)Your export is at midday, where Agile Outgoing averaged about 9p and Prime pays 9p
Solar and a battery that exports in the eveningPrime Outgoing, or Agile Outgoing if you can follow prices16p, or an average of 15p to 19.5p, in the evening window
Solar and a battery, with Flux availableOctopus Flux29p to 32p in the peak, if the import side also suits you
A battery and no solarUsually none: use the battery at homeUsing a kWh at home saves 26p to 37p, more than any of these pays
Export only, import from another supplierOutgoing SEG (4.1p)The only Octopus export tariff open to export-only customers

Who can join, and what to check

  • An Octopus account. Octopus’s Outgoing page says you must already be a customer; new customers join a standard tariff first, then apply.
  • A suitable smart meter. One that provides half-hourly export data. Octopus says that includes almost all SMETS2 meters and most SMETS1 meters, and to contact it to confirm.
  • An export MPAN. If your home does not have one, Octopus applies to the network operator. Its Outgoing page gives 1 to 4 weeks for that step, plus about 5 days to enrol; its FAQ gives 2 days to 2 weeks.
  • A compatible import tariff. Only certain import tariffs pair with Outgoing, and Octopus’s table is an image, so check it.
  • Feed-in Tariff homes. Octopus’s pages describe this differently: the Outgoing page says recent FiT recipients cannot switch yet, while its FAQ says FiT generation payments continue but FiT export payments stop. Ask before applying.
  • The Smart Export Guarantee. Ofgem’s guidance says suppliers with at least 150,000 domestic customers must offer a SEG tariff, and asks applicants with solar and similar systems of 50 kW or less to show their installation and installer are suitably certified, which can be an MCS certificate or an equivalent. It also says that where an export meter records electricity from a battery charged from anything other than the eligible generator, the supplier is not obliged to make SEG payments for it, though it may choose to. Other suppliers’ SEG rates differ, so compare them as well as Octopus’s 4.1p.
  • A home in Great Britain. Ofgem’s SEG page says installations must be located in Great Britain, and the Octopus export rates on this page are GB rates. In Northern Ireland export is supplier-set: Power NI pays 11.88p a kWh from 1 October 2026 to 30 September 2027, and micro-generation export has been settled on actual meter readings since October 2022. The guide to export payments in Northern Ireland has the detail.
  • A connection that can export. A normal single-phase G98 connection limits export to about 3.68 kW; more needs a G99 application.

Using a battery for the evening instead of exporting

Everything above is what export pays. What export competes with is using the energy yourself. On 14 October 2026 Flexible Octopus charged between 25.4p and 29.4p a unit, depending on region and payment method, and Octopus Go’s day rate was between 28.0p and 30.7p, with a fixed Go product at 35.3p to 39.3p. A kWh from the battery that covers your own evening use saves that much, more than Prime’s 16p or Agile Outgoing’s evening average of 15p to 19.5p. So the order of preference for stored energy is: cover your own use first; export what is left. The best tariff for a home battery page sets out how the import side works.

If you are choosing a battery to earn on export, get at least two battery storage quotes and ask each installer what export limit the connection will be set to.

Questions people ask

Which Octopus export tariff pays the most?

It depends on when you export. Flux export pays the highest rate in the 4pm to 7pm peak (28.90p to 31.75p on 28 October 2026) but needs Flux import, solar and a battery. Among the tariffs open to most customers, Agile Outgoing averaged 15.3p to 19.5p in the 4pm to 7pm window over the last 12 months, Prime Outgoing pays a fixed 16p in that window and Outgoing Octopus pays 12p all day. For midday export from solar alone, flat 12p beat Agile Outgoing, which averaged about 9p between 11am and 3pm in London.

How much is Octopus Outgoing per kWh?

12p per kWh at every hour, in every region, on 14 October 2026. Octopus cut the rate from 15p to 12p on 1 March 2026, said wholesale costs had fallen and then stabilised, and describes the tariff as variable, so the rate can change with notice.

What is Prime Outgoing Octopus?

A 12-month fixed export tariff that pays 16p per kWh from 4pm to 7pm and 9p per kWh the rest of the day, according to Octopus's Outgoing page, which says there is no exit fee. It is aimed at homes with solar and a battery that can shift export into the evening peak.

Is Prime Outgoing better than Outgoing Octopus?

Only if enough of your export happens from 4pm to 7pm. The break-even is 3 in 7, or 42.9%, of exported units in that window: (12 minus 9) divided by (16 minus 9). A battery that exports only in the evening earns 33% more on Prime; a solar array exporting at midday earns 25% less.

Do I need solar panels for an Octopus export tariff?

Octopus describes Outgoing as suited to homes with solar, battery storage or other ways of exporting, and does not list panels as a strict requirement. Octopus Flux needs both solar and a battery. Outgoing SEG is Octopus's Smart Export Guarantee tariff, and Ofgem expects solar and similar systems of 50 kW or less to show MCS certification or an equivalent.

Do I need an MCS certificate for Outgoing Octopus?

Octopus's pages do not agree, and an older FAQ says a certificate is required for systems installed after April 2019 while also saying Octopus will take some customers without one. Ask Octopus what it will accept for your system before you apply. The Smart Export Guarantee has its own rule from Ofgem: MCS or equivalent evidence for systems of 50 kW or less.

Can I use an Octopus export tariff with any import tariff?

Not every pairing works. Octopus says Outgoing works best with most import tariffs and publishes a compatibility table that is an image on its help page, so check the table or ask. Flux export pairs with Flux import, and Outgoing SEG can be combined with an import tariff from any other supplier.

Read next

Ask for quotes to compare

Four short steps. Nothing is shared until you press send, and every question except your name, email and postcode is optional.

What are you looking for?
About your home
Anything else in the picture? (optional)
Where is the home?
Where should quotes go?
  • What happens next: we reply by email. This site is not an installer and does not visit your home.
  • When you get any written quote, check that it is itemised. Ask for the usable capacity in kWh, the inverter size in kW and the warranty terms in writing.
  • Put the price into the quote checker before you sign anything. There is no obligation at any point.
Check a quote Get quotes